Maricopa Community Colleges  CRP102AN   19952-99999 

Official Course Description: MCCCD Approval: 10-25-94

CRP102AN  1995 Spring – 2009 Fall

L+L

1 Credit(s)

1.50 Period(s)

Concrete Formwork: Culverts, Headwall and Wingwalls

Laying out and building culvert headwall and wingwall forms using a single whaler assembly.

Prerequisites: Registered Apprentice Status or permission of the Apprenticeship Coordinator.

Go to Competencies    Go to Outline
 

MCCCD Official Course Competencies:

 

CRP102AN  1995 Spring – 2009 Fall

Concrete Formwork: Culverts, Headwall and Wingwalls

 

1.

Define specific terms pertaining to headwall and wingwall form construction for culverts. (I,II)

2.

Construct headwall and wingwall forms using a single whaler assembly from a set of shop drawings. (III)

Go to Description    Go to top of Competencies
 

MCCCD Official Course Outline:

 

CRP102AN  1995 Spring – 2009 Fall

Concrete Formwork: Culverts, Headwall and Wingwalls

 

I. Concepts and Terms

A. Headwall

B. Wingwall

C. Cross-Over Pipe

D. Single Whaler

E. Lacing

F. Log Cabin Corner

II. Form Components

A. Snap Tie

B. Jahn Clamp (Cow Bell)

C. Champher Strip

D. Bulkhead

III. Skills and Procedures

A. Single Whaler Assembly

B. Laying Out Angled Wall Forms

C. Reading Shop Drawings

 

 

Go to Description    Go to top of Competencies    Go to top of Outline