1.
|
Identify the tools to layout an arch and the terms used in describing
an arch. (I)
|
2.
|
Identify the recommended layout procedures for curved arches and
describe how tile is set on a curved arch. (I)
|
3.
|
Identify the tools required for floating a dome and describe how
domesare prepared for tile work and how templates are constructed.
(II)
|
4.
|
Identify the procedures used to float true circular walls and
describehow contoured walls are floated. (III)
|
5.
|
Identify the recommended methods of floating circular columns and
describe how circular columns are prepared for floating and how
ceramic mosiac tile is applied tooa circular column. (III)
|
6.
|
Identify the recommended procedure for laying out a swimming pool and
describe how swimming tile is set and how coping tile is set on a
residential pool. (IV)
|
7.
|
Identify the recommended procedures for tiling a fountain and
describehow a fountain is laid out for tile work. (IV)
|
8.
|
Identify the different types of stairways and the recommended method
of tiling a stairway and describe how tile is laid out on a stairway.
(V)
|
9.
|
Identify the recommended method of installing a Roman bath and
describe how the basic structure is prepared for a tile-lined bath.
(VI)
|
10.
|
Demonstrate laying tile on nonflat surfaces of various structures
including surface preparation and tile layout. (I-VI)
|
|