| Official Course Description: MCCCD Approval: 07/22/08 | |||
|---|---|---|---|
| SUN138 20052-20086 | LEC | 1 Credit(s) | 1 Period(s) |
| Introduction to Aboveground Pipe Installation | |||
|
Types of pipe, flanges, gaskets and bolts. Step-by-step procedures for
installing pipe sleeves and floor penetrations. Reading and interpreting
spool sheets and erecting spools. Prerequisites: (Registered apprentice status and ABC152) or permission of the apprenticeship coordinator. | |||
| MCCCD Official Course Competencies: | |
|---|---|
| SUN138 20052-20086 | Introduction to Aboveground Pipe Installation |
| 1. | Identify and describe proper storage procedures to maintain quality pipe and piping materials. (I) |
| 2. | Identify types of flanges and describe their specific applications. (II) |
| 3. | Identify types of gaskets and bolts used with flanges. (III) |
| 4. | Describe the procedure for locating flange bolt holes and installation procedures for pipe with flanged connections. (IV) |
| 5. | Lay out and install pipe sleeves and floor penetrations. (V) |
| 6. | Read and interpret spool sheets. (VI) |
| 7. | Erect spools in piping systems. (VII) |
| MCCCD Official Course Outline: | |
|---|---|
| SUN138 20052-20086 | Introduction to Aboveground Pipe Installation |
|