| Official Course Description: MCCCD Approval: 11/26/02 | |||
|---|---|---|---|
| MEC253 20032-20086 | L+L | 1 Credit(s) | 2 Period(s) |
| Aboveground Pipe Installation | |||
|
Identifies types of pipe, flanges, gaskets and bolts. Includes step-by-step
procedures for installing pipe sleeves and floor penetrations.
Prerequisites: Registered Apprentice status or permission of the apprenticeship coordinator. | |||
| Cross-References: ABC253 | |||
| MCCCD Official Course Competencies: | |
|---|---|
| MEC253 20032-20086 | Aboveground Pipe Installation |
| 1. | Identify proper storage procedures to maintain quality pipes and materials. (I) |
| 2. | Identify types of flanges and their applications. (II) |
| 3. | Identify types of gaskets and bolts used with flanges. (III) |
| 4. | Describe the location of flange bolt holes and how to install pipe with flanged connections. (IV) |
| 5. | Lay out and install pipe sleeves and floor penetrations. (V) |
| 6. | Read and interpret spool sheets. (VI) |
| 7. | Erect spools in piping systems. (VII) |
| MCCCD Official Course Outline: | |
|---|---|
| MEC253 20032-20086 | Aboveground Pipe Installation |
|