1.
|
Fabricate sheet metal angle iron projects for air conditioning
installations. (I)
|
2.
|
Install package air conditioning units on stands. (II)
|
3.
|
Disassemble and remove units from roof stands. (III)
|
4.
|
Set and hook-up package gas-packs. (IV)
|
5.
|
Disassemble and remove gas-pack units from roof stands. (V)
|
6.
|
Install remote heat pumps. (VI)
|
7.
|
Remove remote heat pumps. (VII)
|
8.
|
Install remote gas heat and air conditioning units. (VIII)
|
9.
|
Remove remote gas heat and air conditioning units. (IX)
|
10.
|
Successful completion of all competencies of the course requires
demonstration of appropriate safety standards for each activity.
(I-IX)
|
|