Maricopa Community Colleges  IRW181   19952-20086 
Official Course Description: MCCCD Approval: 07/22/08
IRW181 19952-20086 L+L 3 Credit(s) 4 Period(s)
Light Industrial Construction Methods and Materials II
Erection procedures, fasteners and anchors, and cost determination used for pre-engineered buildings.
Prerequisites: IRW180 and apprentice status or permission of the Apprenticeship Coordinator.
Go to Competencies    Go to Outline
 
MCCCD Official Course Competencies:
 
IRW181   19952-20086 Light Industrial Construction Methods and Materials II
1. Erect a pre-engineered building including framing, application of panels, and installation of doors, windows and trim. (I)
2. Identify and describe the type of screws, nails, studs, bolts, and other fasteners used in pre-engineered building erection. (II)
3. Determine labor costs for a pre-engineered building erection project. (III)
4. Describe the procedure for figuring job costs of materials, rental of equipment, and purchasing of the building. (III)
Go to Description    Go to top of Competencies
 
MCCCD Official Course Outline:
 
IRW181   19952-20086 Light Industrial Construction Methods and Materials II
    I. Erection
        A. Structural
          1. Bolts
          2. Rigid Frame
          3. Bracing
          4. Secondary Framing
          5. Canopies
          6. Side Extensions
        B. Panels
          1. Wall
          2. Roof
          3. Fiberglass
        C. Doors
          1. Sliding
          2. Hinged
        D. Windows
        E. Trim
          1. Gable
          2. Corner
          3. Gutter
          4. Valley
          5. Eave
      II. Fasteners and Anchors
          A. Screws
            1. Self Tapping
            2. Self Drilling
            3. Stitch
            4. Color Coding
            5. Proper Installation
          B. Straw Nails
          C. Nelson Studs
          D. Ram Sets
            1. Safety
            2. Color Coding of Charges
            3. Proper Length of Nail
          E. Bolts
            1. Toggle
            2. Quick Set
            3. Wedgits
          F. Pop Rivits
          G. Mastic
        III. Cost Awareness and Quality Control
            A. Labor Cost
            B. Materials Per Square Foot
            C. Rental Of Equipment
            D. Purchasing
        Go to Description    Go to top of Competencies    Go to top of Outline