1.
|
Read and interpret blueprints for installation of sub-framing for
entrance ways and select the proper tools for installation of
sub-framing for entrance ways. (I)
|
2.
|
Setup, adjust and use a level-transit and use a leveling rod to
establish an elevation. (II)
|
3.
|
Use a rule to establish new bench marks. (II)
|
4.
|
Convert liner to metric measurement and metric to linear measurement.
(II)
|
5.
|
Solve field leveling problems involving signed numbers (+ or -). (II)
|
6.
|
Read the degree scale and vernier to measure angles, horizontal and
vertical. (II)
|
7.
|
Properly care for transits. (II)
|
8.
|
Erect and install revolving doors, with overhead or floor mechanisms,
following recommendations accompanying the materials. (III)
|
9.
|
Layout wall and window installation jobs, and erect walls and windows
from pre-fabricated materials. (IV)
|
10.
|
Prepare surfaces for caulking and mix and apply caulking compounds
properly. (V)
|
11.
|
Identify construction metals by their finish.(V)
|
12.
|
Handle, store, and clean construction metals properly. (V)
|
13.
|
Install vaults, drive-up windows, night depositories, mail chutes,
door checks, and stage rigging. (VI)
|
|