| Construction Estimating II | |||
| Details of job estimates. Includes unit cost considerations and subcontracting. Emphasis on bid preparation. Prerequisites: GTC121 or permission of instructor. | |||
| MCCCD Official Course Competencies: | |
|---|---|
| GTC123 19886-19935 | Construction Estimating II |
| 1. | Determine quantities required from plans and specifications. (I) |
| 2. | Use estimator's reference books. (II) |
| 3. | Prepare specifications for trade sections. (III, IV) |
| 4. | Prepare specifications for general conditions. (IV) |
| 5. | Outline the time frame for proposals and bid acceptance. (V) |
| 6. | Prepare a formal bid. (V) |