1.
|
Define the periodic and preventative maintenance procedures for
central air handling systems. (I)
|
2.
|
Locate and explain the function of components of specific unitary and
central air-conditioning systems. (I, II)
|
3.
|
Perform pump sizing measurements and calculations. (I, II, III)
|
4.
|
Locate and explain the function of components of specific air and
water air-conditioning systems. (III)
|
5.
|
Explain the general start-up procedures for a chilled water air
conditioning system. (III)
|
6.
|
Describe specific start-up procedures for chillers using scroll,
reciprocating, rotary screw and centrifugal compressors. (III)
|
7.
|
Define the periodic and preventative maintenance procedures for each
type of chiller. (III)
|
8.
|
Locate and explain the function of components of a hot water boiler
system. (IV)
|
9.
|
Perform "Rounds and Readings" on operating air and water systems
including chilled water, condenser water, boiler, chiller and air
handlers. (V)
|
10.
|
Measure static pressure, velocity pressure, and total pressure in
specific ducts. (VI)
|
11.
|
Calculate air velocity and cubic feet per minute (CFM) in specific
ducts. (VI)
|
12.
|
Evaluate air conditioning systems for energy balance using the
principles of psychrometrics. (VII)
|
13.
|
Trace and calculate the thermodynamics of an air and water system from
the heat source through a building's air and water systems. (VII)
|
|