1.
|
Identify and explain the use of shoring materials used in trenching.
(I)
|
2.
|
Identify and explain the use of premanufactured support systems. (II)
|
3.
|
Describe the safe installation of specific types of vertical shoring.
(III)
|
4.
|
Determine the overall fall for the installation of a sewer line. (IV)
|
5.
|
Determine and set the grade and elevation of a trench. (V)
|
6.
|
Explain materials and procedures for initial and final backfilling.
(VI)
|
7.
|
Explain underground pipe installation procedures. (VII)
|
8.
|
Describe the equipment and procedure in the installation of cast iron
pipe. (VIII)
|
9.
|
Describe the equipment and procedure for the installation of ductile
iron and vitrified clay pipe. (IX)
|
10.
|
Describe the equipment and procedure for the installation of carbon
steel and concrete pipe. (X)
|
11.
|
Describe the equipment and procedure for the installation of
fiberglass and thermoplastic pipe. (XI)
|
|