Official Course Description: MCCCD Approval: 10/22/96 | |||
---|---|---|---|
ABC253 19972-20026 | L+L | 1 Credit(s) | 2 Period(s) |
Aboveground Pipe Installation | |||
Identifies types of pipe, flanges, gaskets and bolts. Includes step-by-step procedures for installing pipe sleeves and floor penetrations. Prerequisites: (Indentured status with Associated Builders and Contractors, Inc., and ABC117) or permission of the apprenticeship coordinator. | |||
MCCCD Official Course Competencies: | |
---|---|
ABC253 19972-20026 | Aboveground Pipe Installation |
1. | Identify proper storage procedures to maintain quality pipes and materials. (I) |
2. | Identify types of flanges and their applications. (II) |
3. | Identify types of gaskets and bolts used with flanges. (III) |
4. | Describe the location of flange bolt holes and how to install pipe with flanged connections. (IV) |
5. | Lay out and install pipe sleeves and floor penetrations. (V) |
6. | Read and interpret spool sheets. (VI) |
7. | Erect spools in piping systems. (VII) |
MCCCD Official Course Outline: | |
---|---|
ABC253 19972-20026 | Aboveground Pipe Installation |
|