Maricopa Community Colleges  CAD277   19966-99999 
Official Course Description: MCCCD Approval: 04/23/96
CAD277 19966-99999 L+L 1 Credit(s) 2 Period(s)
Right of Way Improvements III Water and Sewer Lines
Production of plans and profiles for utility improvements. Prerequisites: CAD275 or permission of instructor.
Go to Competencies    Go to Outline
 
MCCCD Official Course Competencies:
 
CAD277   19966-99999 Right of Way Improvements III Water and Sewer Lines
1. Set up and use a prototype drawing. (I)
2. Utilize base maps including topography and existing grades to set up and delineate proposed water and sanitary sewer lines. (II, III, IV)
3. Draw, dimension, and annotate water lines in both plan and profile views. (III)
4. Draw, dimension, and annotate sanitary sewer lines in both plan and profile views. (IV)
5. Interact with team members to produce portfolio components. (V)
Go to Description    Go to top of Competencies
 
MCCCD Official Course Outline:
 
CAD277   19966-99999 Right of Way Improvements III Water and Sewer Lines
    I. Prototype drawings
      II. Base maps
        III. Water lines
            A. Plans
              1. Symbols
              2. Notes and dimensions
            B. Profiles
              1. Existing and proposed grades
              2. Underground utilities
              3. Piping symbols and notes
          IV. Sanitary sewer lines
              A. Plans
                1. Symbols
                2. Notes and dimensions
              B. Profiles
                1. Existing and proposed grades
                2. Underground utilities
                3. Piping symbols and notes
                4. Inverts and slopes
            V. Team projects
            Go to Description    Go to top of Competencies    Go to top of Outline