| Official Course Description: MCCCD Approval: 11/28/95 | |||
|---|---|---|---|
| ABC102 19936-19956 | LEC | 2 Credit(s) | 2 Period(s) |
| Wall Systems | |||
| Tilt up construction of concrete panels. Methods of testing concrete, forming concrete panels, pouring, lifting, and stripping panels. Prerequisites: Indentured status with Associated Builders and Contractors Inc., or permission of the apprenticeship coordinator. | |||
| MCCCD Official Course Competencies: | |
|---|---|
| ABC102 19936-19956 | Wall Systems |
| 1. | Define "tilt up construction" and describe the history and evolution of tilt up construction. (I) |
| 2. | State the advantages and disadvantages of using tilt up construction and identify specific designs used in tilt up construction and their applications. (II) |
| 3. | Describe the formation of panels and the creations of panel designs. (III) |
| 4. | Describe specific tests for concrete and how concrete is placed, finished and cured for panels. (IV) |
| 5. | Describe the stripping of concrete forms and state how lifting and bracing inserts are placed in panels. (V) |
| 6. | Describe specific methods for treating a joint between panels. (V) |
| MCCCD Official Course Outline: | |
|---|---|
| ABC102 19936-19956 | Wall Systems |
|