Official Course Description: MCCCD Approval: 06/24/08 | |||
---|---|---|---|
CAD275 20092-99999 | L+L | 1 Credit(s) | 2 Period(s) |
Right of Way Improvements I Base Maps | |||
Production of base maps for use in utility and street improvements.
Prerequisites: (CAD150, and DFT106) or permission of Instructor. | |||
MCCCD Official Course Competencies: | |
---|---|
CAD275 20092-99999 | Right of Way Improvements I Base Maps |
1. | Set up and utilize prototype drawings for base map production. (I) |
2. | Utilize engineering maps to research streets, boundaries, and utility locations for base maps. (II) |
3. | Utilize field notes to generate topographic information. (II) |
4. | Draw and annotate base maps for right of way improvements using current methods and symbols. (II) |
5. | Interact with team members to produce portfolio components. (III) |
MCCCD Official Course Outline: | |
---|---|
CAD275 20092-99999 | Right of Way Improvements I Base Maps |
|