Official Course
Description: MCCCD Approval: 12-12-2006 |
||
ARC270
2007 Fall – 2011 Spring |
L+L
3.0 Credit(s) 6.0 Period(s) 5.1 Load Occ |
|
Architectural
Technology Synthesis |
||
Provides
students an opportunity to integrate and synthesize knowledge and skills
acquired in prerequisite courses. Using AutoCAD, students will complete a
full set of working drawings under supervision comparable to workplace
situations. Includes practice in self-checking work, correcting and editing
drawings and assembling a portfolio. Prerequisites: (ARC148, ARC243, ARC244,
ARC245, and BLT263) or permission of Instructor. |
||
Go to Competencies Go to Outline
MCCCD
Official Course Competencies: |
|
|
|
ARC270 2007
Fall – 2011 Spring |
Architectural Technology Synthesis |
1.
|
Given a
preliminary design, use Computer-Aided Drafting (CAD) to complete working
drawings to professional standards. (I) |
2.
|
Complete working drawings under supervision comparable to
workplace situations. (I) |
3.
|
Incorporate and
synthesize information from previous courses, manufacturers' documents,
building codes, ordinances, and published industry standards into production
solutions. (I, II) |
4.
|
Demonstrate entry-level two-dimensional (2D) skills using
Computer-Aided Drafting (AutoCAD ). (I, III) |
5.
|
Download and incorporate information from the Web. (I) |
6.
|
Access symbol, schedule and template libraries. (I) |
7.
|
Plot to scale in paper space and model space. (I, III) |
8.
|
Redline drawings and complete required corrections. (II,
III) |
9.
|
Assemble and present a professional portfolio of completed
drawings. (IV) |
10.
|
Demonstrate
professional work habits including promptness, ability to meet deadlines and
capability to work alone and with others. (I-IV) |
Go to Description Go to top of
Competencies
MCCCD
Official Course Outline: |
||
|
||
ARC270 2007
Fall – 2011 Spring |
Architectural Technology Synthesis |
|
|
||
I. Assigned Computer-Aided
Drafting (CAD) Drawings from Preliminary Design A. Cover sheet/index B. Site plan C. Foundation plan D. Floor plans 1. Lower level 2. Upper level E. Exterior elevations F. Sections G. Floor framing H. Roof framing I. Roof J. Interior elevations K. Details L. Schedules M. Electrical plan and
schedules N. Mechanical plan and
schedules O. Plumbing plan and
isometric II. Self-check (Redline)
Work A. Compliance to applicable
codes B. Compliance to applicable
ordinances C. Professional formats D. Completeness E. Accuracy F. Portfolio presentation
quality III. Correct and Edit
Drawings IV. Assemble and Present
Portfolio for Review A. Faculty B. External C. Future use |
|
|